Turnkey solutions from design to installation

We offer a full turnkey solution for the delivery of both our mobile and modular Healthcare Spaces through our extensive specialist healthcare team. We can manage the complete design process from business case approval, in house manufacturing, site installation through to project commissioning. 

We have a wealth of experience in procuring and delivering all site works through our specialist healthcare design team. Having us as your principal designer and/or principal contractor reduces the impact on your supply chain and simplifies the site construction element of the project. The way we operate ensures that our facilities are deployed quickly and efficiently.

Queen Mary Hospital, Roehampton — St George’s University NHS Foundation Trust

The identified need: Additional operating room capacity

Our solution: Mobile/modular 1,300 m2 surgical hub

Step 1:  Design team provided project management: site survey, planning permission, site planning, unit design, drawing, specification, and build, full principal design responsibility with CDMC to ensure compliance with CDM 2015 Regulations.

Step 2: Enabling works carried out: electrical, medical gas, water, and drainage works.

Step 3: Installation of operating room equipment, commissioning of facility, ongoing maintenance, and servicing of the unit.

Design to delivery: February — June 2021

Lancashire Teaching Hospitals NHS Foundation Trust — Royal Preston Hospital, Preston

The identified need: Additional interventional radiology theatre 

Our solution: Hybrid 110 m2 radiology room

Step 1: Delivery of an HTM compliant hybrid operating room facility equipped with a Phillips FlexMove imaging system to initially support interventional radiology. The operating room was future-proofed with an ultraclean system, plus x-ray shielding in place.

Step 2: Provision of the CDM and project management, working with the Trust team to develop, design, commission, and handover the facility as well as building a full connecting corridor interface. 

Step 3: Enabling works carried out: electrical, medical gas, water, and drainage works.

Delivery: September 2020

 

Kettering General Hospital NHS Foundation Trust — Sir Thomas Moore Ward

The identified need: Additional capacity modular ward

Our solution: Hybrid 110 m2 radiology room

Step 1: Technical site survey: site planning; unit design, drawing, specification, and build, full principal design responsibility with CDMC to ensure compliance with CDM 2015 Regulations.  

Step 2: Designed using the methodologies including stakeholder engagement and mapping processes and the RIBA design stages 1—5. 

Step 3: Full certification for fire, electrics, mechanical, medical gas, water, and water.

Delivery: May 2020

Finding a solution that works for your hospital starts here…

Get in touch

Case studies

A 600m² mixed-modality solution meets North Bristol NHS FT's need for a Day Case Facility

A mixed-modality facility, comprising mobile rooms and support rooms built using modern methods of construction, minimises lead times while providing design flexibility.

More info

Milton Keynes University Hospital opens a new Day Case Unit to increase surgical capacity

"My measure of success is refreshing my Patient Tracking List report on a Monday and looking to see by how much our overall waiting list has reduced. And we're doing the best for our patients and that's what really matters to me." - Claire McGillycuddy, MKUH